SURAPID 速捷电梯Product File
Series STEEL WIRE ROPE
SJ-S3110 Pro main visual

Steel Wire Rope Home Elevator

SURAPID arrive at your ideal home

SJ-S3110 ProSTEEL WIRE ROPE HOME ELEVATOR

A steel wire-rope elevator for villas and existing homes, designed for space adaptation, quiet operation and everyday comfort.

Rated load
≤ 400kg
Speed
0.4 / 0.63m/s selectable
Cabin size
1450mm
Cabin area
≤ 1.6㎡
Maximum door width
900mm

Product Features

PRODUCT FEATURES

One-touch emergency call
ARD automatic rescue
One-touch self-rescue
Child lock and remote monitoring

Decoration Design

DECORATION DESIGN

Six complete cabin schemes with coordinated wall, ceiling and flooring options.

XTQ02-2307-3XTQ02-2307-3 Mirror & Wood

Mirror & Wood

XTQ02-2307-3

Overview
Mirror & Wood
Ceiling
Finished ceiling · linear light · square/round
Rear wall
Mirror stainless steel + wood-grain decorative steel
Side wall
Side/rear mirror stainless steel + wood-grain decorative steel
Skirting
Matte black skirting (RAL9004) + concealed LED
Floor
Yashi White artificial marble
Front lintel
Brushed stainless steel
Cabin size
CW 800–1300 · CD 800–1300 · CH 2000–2300 mm
Color temperature
4000K
Panel split
Rear/side edge fixed at 250 mm
Mirror split
750≤CD<850: 200 mm · 850≤CD≤1400: 250 mm · 1400<CD≤1550: 450 mm · through-door side center 500 mm, sides evenly split
Slab note
Slabs over 1200 mm on one side, or panels over 1100 mm, require segmentation
XTQ02-2307-3 decoration scheme QR code
Scan for more details

Decoration images and descriptions are maintained in the CMS. Final configuration and details are subject to the contract and site confirmation.

SJ-S3110 Pro home elevator visual

SPECIFICATION COVERAGE

  • Rated load ≤ 400kg
  • Speed 0.4 / 0.63m/s selectable
  • Cabin size 1450mm
  • Cabin area ≤ 1.6㎡
  • Maximum door width 900mm
  • Overhead height 2700 / 2800mm subject to confirmation

CIVIL DIMENSIONS

  • Minimum pit depth 100mm
速捷电梯有限公司 · SURAPID ELEVATOR

Note:Specifications and decoration schemes are illustrative; final values are subject to site technical confirmation and the contract.